English | فارسی
Taraz Tamin Logo

Taraz Tamin

Supply Chain Management · Engineering Process Solutions

From RFQ to Field Service
Integrated for Engineering Industries

12+
Active Modules
100+
Integrated Pages
100%
Bilingual · Dual-Calendar
Native Persian & English Gregorian · Jalali · Hijri Multi-Step Workflows Barcode Shop Floor MRP What-If Excel & CSV In/Out Per-Project Permissions
taraztamin.ir/dashboard
Executive Dashboard Last updated: 2025-11-12 14:22
$4.8M
Pipeline
$1.9M
Weighted
62%
Win rate
12
Open POs
Planned Actual
PO-2026-0184 Approved2025-11-12
NCR-0042 Open2025-11-11
JOB-2026-0311 In Progress2025-11-10
Built for engineering teams in Iran's oil/gas & petrochemical sector.
Currently deployed at early-adopter sites — actively seeking pilot customers for 2026.
How It Works
1

RFQ & Sales

Capture opportunities, quotes, and customer requirements.

2

Engineering

BOM, routing, drawings, document control with versioning.

3

MRP & Production

Material planning, purchase orders, shop-floor execution.

4

Quality & Delivery

Inspections, NCR/CAPA, warranty, field service.

Built for Make-to-Order & EPC Projects

End-to-End Workflow

From RFQ, document versioning, MRP, production, quality to field service – fully traceable.

Multi-Level Access

Role & user-based access per project, per page. One person can be sales engineer in one project and manager in another.

Multi-Step Approvals

Configurable workflow engine with role-based steps and escalation — ETO, CTO, MTO, MTS scenarios.

Fast Customisation

Adapt forms, workflows, reports to your needs – days/weeks, not months.

MRP + Supply Chain

Material planning, subcontracting, supplier scorecards, inventory optimisation by purchase/sales orders.

Quality & Traceability

Digital signatures, NCR, CAPA, full inspection history per item/serial number.

One Platform, 12 Integrated Modules
CRM/Sales Projects Engineering Supply Chain Manufacturing Quality Workflow Inventory Shop Floor Maintenance Reports Administration
Beyond the Screenshots – What You Get
🌐

True Multilingual

Full English & Persian (Farsi) interface with RTL support. Users switch on the fly.

📅

Calendar Flexibility

Gregorian, Persian (Jalali), and Hijri calendars – all integrated, per user.

🔐

Granular Security

Role‑based permissions per project, per screen, per function. Full audit log.

📄

Document Control

Check‑in/check‑out, versioning, approval workflows, external sharing.

📊

Excel & CSV Integration

Import/export data directly from/to Excel and CSV files. Bulk upload BOMs, POs, inventory, and inspection records.

Who Is This For?

Oil & Gas / Petrochemical

Equipment overhaul, repair, EPC projects, inspection management.

Industrial Equipment Manufacturing

Make‑to‑order valves, pumps, motors – BOM + MRP + quality.

Engineering & Construction

Project‑based engineering, document exchange, progress billing ("صورت وضعیت").

After‑Sales Service

Warranty tracking, service orders, field technician assignment.

See It In Action – The Complete Journey
Packages

Starter

Contact for Pricing
  • Up to 5 users
  • Core modules (CRM, Projects, Engineering)
  • Bilingual UI
  • Email support
Get a Quote

Enterprise

Custom
  • Unlimited users
  • All modules + custom workflows
  • On-premise or private cloud
  • Data migration & training
  • Dedicated success manager
Talk to Sales
Frequently Asked Questions
Is it cloud-based or on-premise?

Both. Choose a private cloud deployment or install on your own servers — no data leaves your infrastructure in on-premise mode.

Can it truly run bilingual out of the box?

Yes. Every screen, table, form, and report is available in English and Persian with full RTL support. Users switch languages on the fly.

Does it support the Persian (Jalali) calendar?

Yes. All dates can be displayed in Gregorian, Jalali (Shamsi), or Hijri — per user — while the underlying data remains consistent.

What about data migration from Excel or our old system?

We provide Excel/CSV import tools for BOMs, purchase orders, inventory, and inspection records. Custom migrations are available for Enterprise plans.

How long does implementation take?

Typical go-live is 4–8 weeks for Professional, 2–4 weeks for Starter, depending on scope and data volume.

Ready to optimise your make-to-order operations?

Request a live demo tailored to your engineering, manufacturing, or equipment repair business.

Request Demo → Download Brochure ↓

📧 info@taraztamin.ir | 🌐 www.taraztamin.ir

— ✕
Make Qty: —
Inventory
On Hand —
Available —
Quality
Assigned QC ops —
Last inspection —
Purchasing
Open POs —
Overdue POs —
Production
Active orders —
Required 30d —
Non-Conformance
Open NCRs —
Closed NCRs —
Engineering
Documents —
— ✕
ساخت تعداد: —
موجودی انبار
موجودی —
قابل تخصیص —
کیفیت
عملیات QC —
آخرین بازرسی —
خرید
سفارشات باز —
معوق —
تولید
سفارشات فعال —
۳۰ روز آینده —
عدم انطباق
NCR باز —
NCR بسته —
مهندسی
اسناد —